Area where the elevated freeway will pass over Northgate Ln. & Emerson Dr. on overpass structures built in Phase 1A. There is no freeway access at these locations.
PREVIOUS / NEXT
Engineering Drawing-North of College Parkway to South of Arrowhead Drive / (jpg)