To view the engineering drawings in the PDF file format, click the links below.  If you do not have Acrobat Reader, you may download it by clicking the icon above or view the drawings as jpg's.

It is recommended that users with slower connection speeds view the .jpg version.

PHASE 1 Drawings
US 395 to East Lake Boulevard
/ (jpg)
North Carson Street to US 395 / (jpg)
South of Arrowhead Drive to North Carson Street / (jpg)
North of College Parkway to South of Arrowhead Drive / (jpg)
South of College Parkway to North of College Parkway / (jpg)
North of US 50 to South of College Parkway / (jpg)
Fifth Street to North of US 50 / (jpg)

Arrowhead Roundabouts / (jpg)
Carson City Freeway Phase 1 Soundwall Locations / (jpg)

PHASE 2 Drawings
Southern Half of US 50 East Interchange / (jpg)
Lompa Field / (jpg)
Fifth Street Realignment
/ (jpg)
Fairview Drive Interchange / (jpg)
Koontz Lane & Clearview Drive Grade Separation / (jpg)
Snyder Avenue Grade Separation / (jpg)
Southern Interchange / (jpg)

Carson City Freeway Phase 2A Overall / (jpg)
Carson City Freeway Phase 2A Multi Use Path / (jpg)
Carson City Freeway Phase 2 Overall / (jpg)
Carson City Freeway Phase 2 Soundwall Locations / (jpg)
Carson City Freeway Phase 2 Drainage / (jpg)