Carson City Freeway Phase 2A |
||
| Phase 2A |
The following file is the geotechnical information from field investigations and analysis conducted by Black Eagle Consulting, Inc. for the Carson City Freeway Phase 2A Project
|
|
| Kings Canyon Channel Bridge |
The following file is the geotechnical information from field investigations and analysis conducted by Black Eagle Consulting, Inc. for the Kings Canyon Channel Bridge as part of the Carson City Freeway Phase 2A Project
|
|
| Fairview Drive Interchange |
The following file is the geotechnical information from field investigations and analysis conducted by NDOT for the Fairview Drive Interchange as part of the Carson City Freeway Phase 2A Project |
|
|
Fifth Street |
The following file is the geotechnical information from field investigations and analysis conducted by NDOT for the Fifth Street Grade Separation as part of the Carson City Freeway Phase 2A Project |
|
|
Phase 1 |
The following file is the Final Geotechnical Investigation Report conducted by Kleinfelder, Inc. for Carson City Freeway Phase 1.
|
|
|
Phase 2 |
The following file is the Exploration Boring Logs, Line Sampling, Detention Basin Sampling. conducted by NDOT for Carson City Freeway Phase 2. |
|
|
Exploration Boring Logs |
The following file is the Exploration Boring Logs, Line Sampling, Compaction Report conducted by NDOT for Carson City Freeway.
|
|
|
Revised Preliminary Geotech Analysis |
The following file is the Revised Preliminary Geotech Analysis, Lompa Ranch to Clearview Dr. prepared by Harding ESE for the Carson City Freeway. |
|
|
Geotechnical Investigation for Hydraulics Analysis Report |
The following file is the Geotech Investigation for Hydrauics Analysis Report prepared by Kleinfelder, Inc. for the Carson City Freeway, north and south of U.S. 50 E. |
|
|
U.S. 395 Carson City Interim Bypass |
The following file is the U.S. 395 Carson City Interim Bypass Expressway 2000 report prepared by Lumos and Associates, Inc. for an alternate at grade expressway from Fairview Dr. to U.S. 395, north of Bonanza Dr.
|
|
|
Exploration Boring Logs Carson City Freeway Phase 1B |
The following file is the Exploration Boring Logs prepared by NDOT for the Carson City Freeway Phase 1 B Project.
|
|
|
Phase 2A |
The following file contains the Project Cross Sections. |
|
| Sierra Pacific Power Company Plans |
The following files are the Sierra Pacific Power Company plans for the electrical service points of connection for the Carson City Freeway Phase 2A project.
|
|
|
Construction Schedule |
The following PDF file contains the Carson City Freeway Phase 2A Construction Schedule. |
|
|